Multiply length × width × thickness in metres, then add 5 to 10%. A 4 m × 3 m slab, 10 cm thick, needs 1.2 m³ before the extra.
Published · 4 min · By the Convert & Calculate team
Try it: Concrete Volume
Open the full toolYour details
Try an example
Result
Concrete volume
0.600 m³
0.78 cubic yards
- Concrete weight
- 1,440 kg (1.44 t)
- Bags needed (25 kg)
- 50
Good to know: A slab 3 m × 2 m × 10 cm needs 0.6 m³, about 1,440 kg of concrete.
How it was worked out · notes
- Assumes 2,400 kg/m³. Buy 5–10% extra for uneven ground and spillage. Follow the mix guidance for your project.
Bags needed by bag size
Pre-mixed bags at their typical yield. Your bag size is highlighted. For larger jobs, ready-mix delivery is usually easier.
| Bag size | Bags | Weight of bags |
|---|---|---|
| 20 kg | 64 | 1,280 kg |
| 25 kg | 50 | 1,250 kg |
| 40 kg | 32 | 1,280 kg |
The sum, step by step
Put every measurement into the same unit first. For the 4 m × 3 m slab, 10 cm becomes 0.1 m, so the volume is 4 × 3 × 0.1 = 1.200 m³. At the 2,400 kg per cubic metre the calculator assumes, that weighs 2,880 kg.
Then add your allowance for uneven ground and spillage. Adding 10% takes 1.2 m³ to 1.32 m³. The 5 to 10% range is a rule of thumb, so use the top of it when the ground is rough.
Common slab sizes
| Slab | Volume | Weight | 25 kg bags |
|---|---|---|---|
| 3 m × 2 m × 10 cm | 0.600 m³ | 1,440 kg | 50 |
| 4 m × 3 m × 10 cm | 1.200 m³ | 2,880 kg | 100 |
| 5 m × 4 m × 15 cm | 3.000 m³ | 7,200 kg | 250 |
| 10 ft × 10 ft × 4 in | 0.944 m³ (1.23 cubic yards) | 2,265 kg | 79 |
What changes the answer
- Thickness. Volume rises in step with it, so going from 10 cm to 15 cm needs 50% more concrete. A 5 m × 4 m slab needs 2 m³ at 10 cm, and 3 m³ at 15 cm.
- Uneven ground. Measure the depth in several places and use the average, not the shallowest point.
- Bag yield. The calculator assumes a 25 kg bag makes 0.012 m³. Yield varies by product, so check the label and adjust.
Bags or ready-mix?
Compare the bag count with what you can realistically lift and mix. A 1.2 m³ slab means moving 100 bags and 2.88 tonnes by hand. Once that looks unrealistic, ask local suppliers about ready-mix delivery, including any minimum order and whether a truck can reach the site.
The easy mistake
Mixing units is the usual slip. Treating 4 inches as 0.4 ft, for example, gives 20% too much, because 4 inches is one third of a foot, or about 0.333 ft. Use the length converter if your tape and your plan disagree.